Sale!

Zhixuanke 1 inch wide by 15 feet-160 feet long Nylon Training Leash – For Large and Medium Dogs – Long Lead – Great for Training, Play, Camping, or Backyard

$8.99$20.00

NYLON TRAINING LEAD – This durable, long, nylon dog training leash will outlast cotton leashes. All stitching is reinforced and the nickel plated clip swivels to resist twisting. Our long dog leash is great for medium and large dogs. You’ll love using it as a backyard dog leash, for off leash dog training, and more.
DIMENSIONS – This dog leash measures 1 inch wide by 15 feet long 30 feet long 50 feet long 65 feet long 100 feet long 160 feet long. Great for hiking, camping, training, hunting, backyard, beach, recall training, outdoor play with tennis balls, and swimming!
Solid Metal Ring – The solid ring on this nylon dog leash tail too strong to be damaged by the big dog,and will fasten to a post in the yard,the lawn or the park.

Clear
SKU: N/A Category:

Description

Built Strong
The Free Range 1 inch nylon, extra long training dog leash with maintain is built strong. Nylon leashes have a long lifespan, cotton leashes get frail and break faster than you would think. Free Range 1 inch is built with heavy duty materials that can withstand daily use over an extended time period. It may be used with medium and large size dogs.

Sizing
15Feet 30 Feet 50 Feet 65 Feet 100 Feet 160 Feet.

Money Back Guarantee
Your purchase is backed by “The Boss Promise”, our 10 Year Total Satisfaction Guarantee.


NYLON TRAINING LEAD – This durable, long, nylon dog training leash will live much longer than cotton leashes. All stitching is reinforced and the nickel plated clip swivels to withstand twisting. Our long dog leash is great for medium and large dogs. You can love the usage of it as a backyard dog leash, for off leash dog training, and more.
DIMENSIONS – This dog leash measures 1 inch wide by 15 feet long 30 feet long 50 feet long 65 feet long 100 feet long 160 feet long. Great for hiking, camping, training, hunting, backyard, beach, recall training, out of doors play with tennis balls, and swimming!
Solid Metal Ring – The solid ring on this nylon dog leash tail too strong to be damaged by the big dog,and will fasten to a post in the yard,the lawn or the park.
LONG LEASH: This training leash is great for teaching your dog recalls. It has the length needed so they can wander and ensure your command to come! is obeyed.
Means that you can teach your dog recalls and other obedience skills.

Additional information

Binding

Size

, , , ,

Brand

Label

Manufacturer

PackageQuantity

ProductGroup

ProductTypeName

Publisher

Studio